Demolition Phase

Frameing for the pocket door, and drywall in the closet

drywall, closet door frames and pocket door installed
View of the pocket door from the inside of the bathroom

Shower stall with the fiberglass shower walls removed, the left side of the shower had a 12 inches of wasted space, all I had to do was move the copper plumbing to take advantage of the extra space. This picture also shows the pre-slope concrete for the shower pan

half wall, backerboard, rubber showerpan liner, final 2 inch sloped layer of concrete, and new recessed shower light

Finished shower pan with drain, ready for tiling (once Shalane picks out tile)

shelf for shampoo

Alta is satisfied with the slope of the shower pan ( at least 1/4 inch per foot)
I'm impressed Dan! Good job.
ReplyDeleteI am just so super impressed with you guys. Way to go!
ReplyDeleteWell. You can tell Dan did that post. I was almost impressed with you Shalane...all that construction talk...Ha! Dan, it's looking SO GOOD! I'm going to have to come back and visit when everything is done...
ReplyDeleteI can't wait to see the after pictures. I'm sure it will look amazing!
ReplyDelete